Deferring a Prospective TIA
A time impact analysis (TIA) that sources the current update when a delay event arises, before having been superseded by the next update, is a near-real-time prospective TIA. A TIA time-distant from an unresolved delay that sources the update current when the TIA is performed is a deferred TIA. Per RP 52R-06, at some point, deferring preparation and approval so diminishes the value of a prospective TIA that performing a retrospective forensic TIA becomes appropriate. This presentation identifies considerations for deferring a TIA and provides prospective and deferred TIA guidance, including how to apply the longest-path theory of criticality in late completion delay attribution.
Presenter:
Gui Ponce de Leon, PhD, PE, PMP
CEO Emeritus/Chief Innovation Officer, PMA Consultants LLC
Dr. Gui started his career in 1969 facilitating interactive planning sessions with Townsend & Bottum, Inc. project managers and superintendents. He has served as contractor chief scheduling engineer, scheduling consultant, program manager, construction manager, forensic scheduler, and expert witness. Dr. Gui has pioneered scheduling innovations throughout his 57-year career; he holds nine US patents on his graphical path method/GPM. Dr. Gui obtained his MS in Construction Engineering and Management and his PhD in Civil Engineering from The University of Michigan in 1969 and 1972, respectively. From 1973-1989, he taught two graduate courses in network-based scheduling at the College of Engineering, Civil & Environmental Department at Michigan.