(From John Hollmann)
Good work. Please find attached my proposed changes and edits recorded on the PDF document.
------------------------------
John Hollmann CCP CEP DRMP
Owner
Validation Estimating LLC
Ashburn VA
1 (703) 945-5483
jhollmann@validest.com
------------------------------
------------------------------
Christian Heller
Director of Technical Guidance
AACE International
cheller@aacei.org------------------------------
Original Message:
Sent: 02-27-2024 09:04 AM
From: Christian H. Heller
Subject: (PUBLIC REVIEW DRAFT) 134R-24: Project Life Cycle Change Management for the Asset Owner: Treatment and Control
(PUBLIC REVIEW DRAFT) 134R-24: Project Life Cycle Change Management for the Asset Owner: Treatment and Control
You may provide your comment by either:
· Posting a message in this thread directly
· Providing mark-up in the PDF file and posting it in this thread
· Providing your comment in the "REVIEWER" columns of the Excel file and posting it in this thread
This draft RP is open for review and comment until April 11, 2024.
------------------------------
Christian Heller
Director of Technical Guidance
AACE International
cheller@aacei.org
------------------------------