Submitted Comments on Behalf of an External Contributor
I am posting below a compiled set of comments received externally from Dr. Elvis Hernandez, who shared his feedback via LinkedIn.
(LinkedIn profile: https://www.linkedin.com/in/dr-elvis-hernandez-perdomo-phd-fin│phd-engsc-8814689/)
These comments have been consolidated here to ensure they are properly captured within the official public review record.
------------------------------
Leonardo Muller
Cost Engineering Consultant
Petroleo Brasileiro S.A. Petrobras
Rio de Janeiro
leonardomuller@petrobras.com.br------------------------------
Original Message:
Sent: 10-08-2025 03:03 PM
From: Christian Heller
Subject: (PUBLIC REVIEW DRAFT) 139R-25: Cost Estimate Classification System – As Applied in Decommissioning for the Offshore Petroleum Exploration and Production Industries
(PUBLIC REVIEW DRAFT) 139R-25: Cost Estimate Classification System – As Applied in Decommissioning for the Offshore Petroleum Exploration and Production Industries
You may provide your comment by either:
- Posting a message in this thread directly
- Providing your comment in the "REVIEWER" columns of the Excel file and posting it in this thread
Please note that this RP includes two new terms and definitions:
- DECOMMISSIONING
- ASSET RETIREMENT OBLIGATION (ARO)
This draft RP is open for review and comment until November 22, 2025.
------------------------------
Christian Heller
Director of Technical Guidance
AACE International
cheller@aacei.org
------------------------------