I benchmarked 15 leading AI models on controlled project-controls tasks, and the spread between them is large enough that it should change how we talk about "using AI" in scheduling. Each model answered the same unaided schedule-analysis problems: critical path, float, DCMA-14 logic, statusing, and ...
|